Rebuilding the Club, Renewing the Future – Juve Lis Identity
Reconstruir a Região Centro Juntos!

Rebuilding the Club, Renewing the Future – Juve Lis Identity

Athletes, students, and the community overcome limits, but the storms have left their mark. The challenge is to rebuild and restore dignity to the club, creating a space worthy ...

Athletes, students, and the community overcome limits, but the storms have left their mark. The challenge is to rebuild and restore dignity to the club, creating a space worthy of its history, for those who wear the jersey and for all who visit us.

Under the motto "Rebuilding the Club, Renewing the Future," the campaign will highlight not only the recovery of the infrastructure, but above all the rebirth of a space with history, identity, and ambition. The aim is to convey the idea of a club that, in the face of adversity, reinvents and strengthens itself, projecting a more dignified, inclusive, and inspiring future.

The campaign associated with this project will aim to mobilize the community, reinforce the sense of belonging, and give visibility to the club's transformation process, acting as a natural extension of the physical intervention itself.

As a benchmark for regional and national handball, the club participates in national competitions at all levels and genders , with particular emphasis on the senior women's team in the national 1st division . Every weekend, it hosts opposing teams from various parts of the country, establishing itself as a space for competitive, social and community gatherings.

In this context, the campaign will seek to highlight not only the need to repair the damage, but also the opportunity to innovate and significantly improve the conditions offered. The goal is to create a more dignified, safe, and welcoming environment for sports practice—in this case, handball—that values athletes, visitors, and the entire community.

Expected impact: Significant improvement in the conditions of use of the space; Enhanced safety for all users; Aesthetic and functional improvement of the facilities; Continuity of sporting activity in suitable conditions; Strengthening of the club's role as a reference point in the community.

porta de entrada que partiu com tempestade

About the author

With a history established since 1985, the club presents itself as an entity with the capacity, experience, and legitimacy to carry out this project, reinforcing its role as a handball reference in the city of Leiria and on the national scene.

Its regular participation in national competitions, across all age groups and genders , as well as the presence of the senior women's team in the national first division , demonstrates not only the club's sporting dimension but also the increased responsibility in how it welcomes athletes, opposing teams, and other sports stakeholders. Every weekend, the club hosts official matches, receiving visitors from all over the country, which makes the quality, functionality, and image of its facilities even more relevant.

The strong connection to the community, expressed through its partnerships and the provision of services such as the gym and physiotherapy, reinforces the importance of this investment, whose impact goes beyond the sporting world, also contributing to local well-being and social cohesion.

In this context, the promoter intends not only to repair the damage caused by the storms, but also to seize this moment as a strategic opportunity to evolve. The project thus emerges as a natural step in the club's trajectory: to improve the conditions for practicing sports, reinforce its identity, and create a more welcoming, modern, and dignified environment for athletes, users, and visitors.

Aligned with the campaign “Rebuild the Club, Renew the Future”, the promoter sees this project as more than just a physical intervention — it is an affirmation of continuity, ambition and commitment to the future. A future where the club will continue to train athletes, compete at the highest level and provide a space of reference, welcoming and identity for the entire community.

danos pintura em todo pavilhão, face vento forte (erosão) e inundações

Budget and due dates

Budget

Intervention Amount Unit Cost (€)
Exterior painting and tile repair 1 23,057
Repair/replacement of window and door frames 1 5250
Repair or partial replacement of stones and marbles 1 800
Entrance logo and door decoration 1 3685
Additional work and finishing touches 1 250
Estimated Total excluding VAT 33042
  price including VAT 40641.66

 

Scheduling

Total construction time: 3 to 4 months

Phase 1 – Awarding of the contract and commencement of work (we already have all the quotes - 1 month)

Phase 2 – Intervention (2 to 3 months) Execution of painting, window and floor repair work. Decoration of the entrance and interiors.

Phase 3 – Completion (2 weeks) Final touches.

Estimated completion date: October 2026

Tue, 28/04/2026 - 05:20

Campaign launched

21/04/2026

0 members of the PPL community
support this campaign

  • 0
    new backers

  • 0
    recurrent backers

  • 0
    anonymous backers

Meet the people helping this dream come true