My school - Freixianda School
Reconstruir a Região Centro Juntos!

My school - Freixianda School

I want my playground and my school to be beautiful again - Damage to the school building and outdoor spaces that compromises the safety of children and young people.

I want my playground and my school to be beautiful again - Damage to the school building and outdoor spaces that compromises the safety of children and young people.

During Storm Kristin, its effects caused the destruction of part of the school's roof, as well as a large part of the playground and sports field. The impact was significant, causing extensive damage to the interior of the building and compromising the safety of children and young people playing and enjoying the outdoor spaces, particularly for outdoor sports.

In terms of strategic priorities, it falls under the following categories:

a) Educational equipment;

b) Support structures for children;

The beneficiaries of this intervention are all the students of the Freixianda Basic School, and this intervention guarantees a return to normal functioning of the school.

About the author

The Municipality of Ourém is located in central Portugal, forming part of the district of Santarém and the CIM of Médio Tejo.

It extends over an area of 417 km2 , has a population of around 47,000 inhabitants, residing in two cities, 4 towns and numerous villages, distributed across 16 parishes.

The southern part of the municipality is a more urban area, with two medium-sized cities: Ourém and Fátima, where tourism and services predominate, closely associated with the context of Fátima. The northern part, predominantly rural, is home to small and medium-sized enterprises, especially those related to local products such as wood, metallurgical companies, and construction companies.

Budget and due dates

Project title: Freixianda Basic School

Brief Description: Roof reconstruction, replacement of false ceilings, replacement of damaged flooring, painting of walls and ceilings, replacement of awnings, installation of fencing, and restoration of green areas.

Description Total Value
Shipyard  
Shipyard assembly and disassembly 10,000.00
Elementary School Projects  
Repair and/or replacement of existing network panel.
in steel mesh
51,000.00
Repair and/or reconstruction of concrete pillars
existing for securing the exterior fence of the entire
school grounds.
16,800.00
Removal and replacement of existing network sealing.
on the playing field
9,000.00
4. Supply and application of traditional roofing.
made of waterproof PVC tarpaulin
4,500.00
Complete replacement of the tile roof, battens,
Structure of the main building and annex.
174,000.00
Replacement of sandwich panels and related components.
isolation
3,700.00
Replacement of waterproofing on a flat roof.
and its isolation
7,800.00
Restoration of green areas, including the planting of tree and shrub species. 83 250,00
TOTAL (values excluding VAT) 360,050.00

Budget Estimate: €360,050.00 (Including VAT €381,653.00)

Fri, 24/04/2026 - 14:47

Campaign launched

21/04/2026

0 members of the PPL community
support this campaign

  • 0
    new backers

  • 0
    recurrent backers

  • 0
    anonymous backers

Meet the people helping this dream come true