Storm Kristin destroyed the school playground. It is urgent to rehabilitate the space to ensure safe conditions and restore the children's right to play.
With Storm Kristin, the Marinheiros Basic School, located in the parish of Marrazes, in Leiria, was left without the playground equipment for the children to play on, as well as having its shaded areas destroyed. The awning that sheltered the children from the rain and sun flew away. Some of the trees that decorated the school playground and provided shade fell.
The school is attended by 87 children in the first cycle of primary education, many of whom come from low-income families. Most children are at school between 8 am and 7 pm, also attending during school breaks so that their parents can work.
It is urgent to equip the playground with certified play equipment that will restore the appropriate conditions for children to safely enjoy the school's outdoor space.
Play areas are essential for children's physical exercise and emotional well-being.
About the author
The promoter of this initiative is the Marrazes School Group (AEM), in Leiria, with tax identification number 600078094.
The AEM (Area of Educational Intervention) has been a Priority Intervention Educational Territory since 1996. It currently has 2500 students of 37 different nationalities, distributed across 24 educational establishments. Its area of intervention is located in a zone marked by a rather fragile social and economic context.
The Marinheiros Basic School, where the project to renovate the playground and install play equipment is planned, has 87 children in the first cycle of primary education.
Budget and due dates
Budget
Replacement of the flooring in the play area, including the creation of a hopscotch game, labor for removing the old flooring and installing the new one - Cost €4777.00
Installation of an aluminum slide with replacement of the surrounding rubber flooring and securing the equipment to the ground - Cost €8436.94
Outdoor table made of treated wood - Cost €250.00
Enclosure of the playground area using treated wood and planting of resistant vegetation, including labor - Cost €750.00
Repair of the awning structure, including replacement of the broken iron post and installation of a new canvas - Cost €1800.00
Total cost: €16,013.94
Scheduling
Project completion is scheduled for December 2026.
Images
Documents